Pre-development Step by Step – How to Prepare Land for a Development in Poland?

Pre-development Step by Step – How to Prepare Land for a Development in Poland?

12.04.2026

Real estate pre-development (that is, preparing land for a development) is the stage from initial due diligence of the plot, through planning analysis (local plan / Zoning Decision) and arrangements, to obtaining the building permit. This is where developments most often stall, because the formalities can take longer than the construction itself.

A quick checklist (to start)

If you only remember five things: the plan (local plan / Zoning Decision), road access, the environment, access to and collisions with technical infrastructure, and the “attitude” and practice of the authorities in a given area

What is pre-development and why is it key?

Real estate pre-development covers all the actions needed to make it possible to legally design, approve and deliver a project. The most expensive risks appear before “breaking ground”: a lost deposit, the cost of capital frozen in land, an architectural and building design that cannot be approved or delivered, or the need for costly changes after the fact. That is why investment advice for land often begins before the purchase.

Legal and planning analysis of the land (local plan / Zoning Decision)

It is worth starting support before the preliminary agreement is signed. The market still sees offers of land whose designation or legal defects in practice rule out a development, and the problem is not always visible “at a glance”.

The minimum to check before buying:

– legal status (ownership, encumbrances, claims);

– designation and parameters in the local plan, Zoning Decision, location resolution, Integrated Investment Plan or the possibility of obtaining them;

– real access to a public road and the method of traffic access;

– the topography and current use of the site;

– basic utility conditions (available utilities, collisions, potential connection problems).

Technical and environmental surveys before the development

Depending on the scale and location, an environmental decision may be required. The rules and practice can be ambiguous, so it is often worth informally consulting the authority about the classification (before we prepare the design).

At the same time, technical analysis is planned: ground surveys and a geotechnical opinion, identification of collisions, assessment of constraints arising from the neighbourhood, and confirmation of road access conditions. These elements can decide whether the initial assumptions from the local plan or Zoning Decision can be translated into a design.

Consultations with the public administration – how to carry them out effectively?

Early talks with the municipality, the district office, the road manager or the environmental authorities rarely produce “binding” answers, but they make it possible to recognise the authority’s doubts and expectations. It is best to go with something concrete: a concept sketch, options for traffic access, a list of questions and concerns. Good practice – at subsequent meetings, confirm the assumptions made so far so that they are not “forgotten”.

Pre-development can usually be arranged in three stages:

  1. the environmental stage (if required);
  2. the planning stage – obtaining a local plan / Zoning Decision / location resolution / ZPI, their amendments and interpretations;
  3. designing and agreeing the documentation for the building permit together with associated developments (roads, networks, neighbourhood). In practice, authorities expect solutions that ensure the development functions comprehensively (e.g. a driveway from a public road). Gaps in this area can come back at the least convenient moment.

Costs and risks at the pre-development stage. The most common “mines” are:

  • planning uncertainty or the need to change interpretations,
  • problems with road access and traffic arrangements,
  • collisions and technical constraints (ground, infrastructure, buildings on neighbouring plots),
  • environmental risks,
  • procedural delays and the cost of capital. In practice the biggest mistake is “going to design” before you have closed the critical risks. You then pay three times: for the design, for the time and for the corrections.

Does the building permit end the formalities? Not always. Inconsistent practice between the authority issuing the building permit and the building supervision authority may come to light at completion inspections and the occupancy permit. That is why it is worth ensuring the consistency of documentation and arrangements from the start, not only at the finish.

How does an investment adviser support the pre-development process? A good adviser holds the investment process together step by step: from analysis before purchase to formal strategy and conducting arrangements. They organise risks, propose options, keep an eye on the schedule and make sure that administrative decisions and design documentation “play together”. The result should be simple: fewer reversals, fewer surprises and a faster move to construction. If you wish, we can carry out a comprehensive analysis of the plot before purchase or run the full pre-development through to the building permit.

Michał Chmielewski

Author of this article:

Michał Chmielewski

Co-founder and President

15 years of experience in the real estate market. He managed a portfolio worth PLN 10 billion and chaired the team for the New Centre of Łódź.

FAQ

Not 100%. Some problems only emerge once specific design solutions have been adopted or during the procedures. Good due diligence, however, makes it possible to identify the most important risks and prepare scenarios.