Coordinating a Development Through to the Building Permit

Obtaining a building permit is the stage at which all elements of a development must come together – from the architectural design and specialist technical documentation to administrative approvals. In practice, this is one of the most demanding stages of the development process, where even minor inconsistencies can cause delays or require the documentation to be supplemented multiple times.

Importance for the development

At this stage, the formal correctness of the documentation is important, but effective management of the entire project is even more critical. A lack of coordination between designers, specialist consultants and public authorities often leads to errors that only become apparent once the application is being processed, and short deadlines for responding to requests for supplementary documentation often result in an application being left unexamined.

Proper process management, meticulous review of the design documentation and asking the right questions while the application is being prepared can significantly reduce the time required to obtain the decision and limit both formal and design-related risks.

Actual procedure timeline

In theory, the building permit procedure is subject to a statutory 65-day timeframe. In practice, however, this period does not include the formal review stage, time spent supplementing the application at the authority’s request or any suspension of the proceedings. As a result, the actual duration of this stage is usually at least four months.

The schedule may also be affected by related decisions, such as permits for the reconstruction of technical infrastructure, approvals from other authorities (e.g. heritage conservators) or proceedings concerning works on neighbouring properties. Each of these elements may significantly extend the process.

It is also at this stage that neighbours’ concerns and attempts to challenge the development most often come to light. In theory, compliance with the regulations is sufficient to obtain a building permit – but the activity of parties to the proceedings can lengthen the process through numerous appeals, and may even almost block the decision by prompting the authorities to question the application over minor defects in the documentation.

Scope of services

Comprehensive coordination includes, among other things:

  • liaising with public authorities to obtain the permit as efficiently as possible,
  • coordination of architects, road engineers, environmental and heritage specialists, and other experts,
  • review of the completeness and quality of the design documentation,
  • ongoing identification and mitigation of formal risks,
  • maintaining relations with parties to the proceedings and key stakeholders.

Our approach

The building permit process is multi-stage and multidisciplinary. It requires ongoing monitoring of progress, timely responses to requests from public authorities and continuous alignment of the documentation with the actual circumstances of the project.

Coordination is not limited to supervising documentation. Above all, it involves managing the entire process so that it remains as predictable and efficient as possible.

The objective is to guide the development efficiently through to the building permit while safeguarding the investor’s interests.

FAQ

Under the regulations, the architectural and building administration authority should issue a building permit decision within 65 days of a complete application being filed. In practice, however, the total time needed to obtain the permit depends on many factors and often takes several months.

The length of the proceedings is affected by, among other things, the complexity of the development, the completeness of the design documentation, the need to obtain additional opinions and approvals, and any requests to supplement documents. In more complex projects, the documentation stage alone often takes longer than the administrative procedure itself.